CHALLENGE: MONITORING REMOTE GAS PRESSURE ACROSS 23 RURAL COUNTIES WITH UNRELIABLE CELL COVERAGE
Middle Tennessee Natural Gas Utility District (MTNG) serves roughly 70,000 customers across 23 rural counties and several thousand square miles. Its distribution network includes more than 300 regulating stations, long single-feed lines and end-of-line residential delivery points, spread far enough apart that a single technician route can mean hours of driving between sites.
For years, MTNG’s only window into pressure at those remote sites was a chart recorder and, when something looked wrong, someone driving out to read a gauge. Technicians were physically on site once a week, or whenever a customer called in a “no gas” complaint after the fact.
Across much of the territory, cellular service was unreliable enough that even a phone call to the field was hit or miss. And because a low-pressure event could push part of the system below service pressure within hours, MTNG needed a continuous data record and an alarm that would reach staff before customers noticed.